Evercomm reference build. One drawing set, five issues. This set is issued as Datum.

Index
Drawing
Assurance | Evercomm
Sheet
— of 04
Scale
1:1
Units
tCO2e · kWh · SGD
Rev
C
Status
For review
  1. Home
  2. Services
  3. Assurance

Service 02

Assess. Simulate. Verify.

Independent assessment, solution simulation, transition planning and digital verification, for boards and supervisory committees on the granular shift. Delivered by Evercomm engineers, regulator-side experts and standards specialists.

  • PCAF v2025
  • ISSB S1 / S2
  • ESRS
  • ISO 14064 / 14067 / 14068
  • MAS 610
  • CBAM
  • ISSA 5000 ready

Typical engagement

8 to 12 weeks

Sub-offerings

5 productised

Powered by

NxMap and NxPlan

Output

Board pack and audit pack

The offer

Three questions. Five productised answers.

Assurance is not an open-ended consulting retainer. Each sub-offering has a defined input, a defined output and a defined duration, and each runs on the same engines that power Granular Data.

Assess · where you are

Diagnostic, current state

Independent measurement of where your organisation actually sits on the granular shift: for the board, the auditor, the regulator, or the AI team that needs to know what data is fit for purpose.

Strategic assessment
Position on the granular shift, gaps to PCAF, ISSB and MAS 610. Output: assessment report and board pack.
AI readiness
Data and model readiness for AI deployment in regulated contexts. Output: readiness scorecard and risk register.

Simulate · where you could be

Forecast, scenario

Model what happens to portfolio emissions, operational metrics or compliance position under different interventions: capex sequencing, target setting, divestment, technology adoption.

Solution simulation
Model proposed interventions against the transition roadmap. Output: scenario model and comparison brief.
Transition roadmap
Sequenced plan to close the gap: capex priorities, milestones, dependencies. Output: roadmap and investment memo.

Verify · prove it

Certification, audit-ready

Fast-track digital verification of compliance to ISO 14064, ISO 14067, ISO 14068, PCAF v2025, ISSB, ESRS, MAS 610 or CBAM, using the granular data already in your systems and the same audit trail an external assurer will accept.

Digital verification
Standards-conformance certification with full lineage. Output: verification statement and an audit pack acceptable to ISSA 5000 assurers.

Buyers

Three buyer types. Different questions. Same engines.

Assurance is bought by three groups inside a customer organisation. The sub-offering they pick, and the depth of the engagement, depends on which committee they sit on.

Who buys Assurance, what they ask, and where procurement usually sits.
Buyer Roles The question they arrive with Usual starting point
Board and executive CEO, chair, CSO, strategy Where do we actually stand on the granular shift, and what is the path? Strategic assessment, then transition roadmap. Often the first engagement.
Risk, audit and compliance CRO, audit committee, compliance, internal audit Can we prove what we are disclosing? Digital verification for audit-grade certification; AI readiness for the control surfaces now being regulated. Procurement typically through the audit committee.
Sustainability and operations Head of sustainability, operations, engineering Which interventions actually move the number, and what will they cost? Solution simulation and transition roadmap, run against live operational data.

Engagement

Five phases, 8 to 12 weeks, named outputs.

Every phase has a deliverable you can put in front of a committee. Nothing is billed against a discovery phase that produces a slide deck.

Standard engagement shape. Scope, duration and outputs are fixed in the statement of work before work starts.
PhaseDurationWhat happensOutput
Scoping1 to 2 weeks Standards in scope, data sources mapped, sub-offerings selected, success criteria locked, named team assembled. Statement of work, scope memo
Discovery2 to 3 weeks Data inventory, regulatory mapping, baseline measurement. NxOps connectors stood up against customer systems for the duration of the engagement. Baseline data pack, gap register
Modelling3 to 4 weeks NxMap calculations, NxPlan scenarios, verification runs against standards-conformance rule packs. Specialist review by regulator-side experts. Calculation pack, simulation results, verification log
Delivery1 to 2 weeks Report draft, board pack, verification statement, sample audit pack. Walk-through with the customer team and, where relevant, the external assurer. Assessment report, board pack, verification statement
Handover1 week Training, methodology transfer, optional transition path to Granular Data or to an ongoing assurance retainer. Methodology pack, transition memo

Talk to us.

Tell us which regime is arriving first and what data you already hold. We will tell you honestly whether it is a Granular Data build, an Assurance engagement, or neither.