Evercomm reference build. One set of content, five visual editions. You are reading Console.

Evercomm
  1. Home
  2. Company
  3. Case studies

Evidence

Six deployments. Named, dated and published.

Case studies are the work: a named customer, a defined problem and a result. They are indexed here, separately from articles and announcements, so the two are never confused.

  • Agri-industrial
  • Manufacturing
  • Ports
  • Districts
  • Built environment
  • Logistics

All case studies

Agri-industrial · Thailand · NxPlan

KTIS Group

Net-zero planning for the world's largest sugar mill. Net-zero carbon roadmapping and solution scouting across a large, energy-intensive agri-industrial operation.

Manufacturing · Japan · NxMap

Mitsubishi Electric

Measuring the carbon footprint of operations. A proof-of-concept exercise at the Fukuyama Works factory, measuring operational emissions at source rather than by estimate.

Ports · Singapore · NxOps

Jurong Port

Energy and emissions optimisation. Developing a smart, multi-energy infrastructure across a working port, with the operational data feeding both compliance and engineering decisions.

Districts · Singapore · NxOps and NxPlan

Punggol District

District infrastructure energy and emissions optimisation. Smart, multi-energy infrastructure at district scale, combining chiller plant, thermal storage and distributed generation.

Built environment · Singapore · Assurance

Super Low Energy Buildings

Verification process for SLEB. Digital verification applied to the Super Low Energy Buildings programme, turning building performance claims into verified records.

Logistics · Thailand · NxOps

K C DAT

Monitor and verify energy and carbon performance in real time. A strategy to monitor and measure the largest energy-consuming units driving overall energy and carbon performance, and the processes to keep it running.

Where these links go Case study detail pages are published on evercomm.io (opens in a new tab) and open in a new tab. This build indexes them rather than duplicating them, so nothing here is a placeholder or a dead end.

Talk to us.

Tell us which regime is arriving first and what data you already hold. We will tell you honestly whether it is a Granular Data build, an Assurance engagement, or neither.